HVAC Installs

Turn every split-system into a VEEC payday

Partner with VEURebates.com.au to claim Victorian Energy Efficiency Certificates on every eligible reverse-cycle install - residential or small commercial. We handle the compliance, you focus on the install.

Installer servicing a split-system air conditioner outside an Australian home

Eligible VEU activities

VEECs are calculated against the existing system being decommissioned. We support every eligible scenario under Activity 6 - from electric resistance to ducted gas, with or without an existing AC.

6(i)

Hard-wired resistance electric room heater only

Decommissioning a hard-wired electric resistance room heater as the existing primary heating source.

6(ii)

Hard-wired resistance electric room heater + Refrigerative AC

Decommissioning both a hard-wired electric resistance room heater and an existing refrigerative air conditioner.

6(iii)

Central electric resistance (100m+) only

Decommissioning a central electric resistance heating system serving 100m² or more of conditioned space.

6(iv)

Central electric resistance (100m+) + Refrigerative AC

Decommissioning both a central electric resistance system (100m²+) and an existing refrigerative air conditioner.

6(v)

Ducted reverse-cycle air conditioner (main heating)

Replacing a ducted reverse-cycle air conditioner that is the main form of heating the premises.

6(vi)

Non-ducted reverse-cycle air conditioner

Replacing an existing non-ducted reverse-cycle air conditioner with a higher-efficiency unit.

6(vii)

Ducted gas heater only

Decommissioning a ducted gas heater as the existing primary heating source.

6(viii)

Ducted gas heater + Refrigerative AC

Decommissioning both a ducted gas heater and an existing refrigerative air conditioner.

6(ix)

Non-ducted gas heater only

Decommissioning a non-ducted (space) gas heater as the existing primary heating source.

6(x)

Non-ducted gas heater + Refrigerative AC

Decommissioning both a non-ducted gas heater and an existing refrigerative air conditioner.

6(xi)

No decommissioning

New installation where no existing heating or cooling unit is being decommissioned.

Why HVAC installers partner with us

Best VEEC rates

Different settlement options to cater for every type of installer

Audit-ready paperwork

We handle the compliance, eligibility and lodgement.

ESC-aligned process

Every install is checked against the current Essential Services Commission requirements.

Fast turnaround

Submit from site, get reviewed in hours and lodged for VEECs the same week.

Ready to claim VEECs on every job?

Get started